Shoring and Bank Stabilization

Tri-AMM Developments has a shoring division specializing in stabilizing vertical earth walls during the early phase of  foundation construction.  

We use shotcrete and soil nailing along with rebar and wire mesh to hold vertical earth walls in place so that permanent concrete walls can be constructed. 

We have our own drill rig, grout plant and the experienced personnel to complete jobs on time and on budget.

vertical earth wall held in place with shotcrete and soil nails
vertical wall with shotcrete and a tracked skid steer
small drill rig against vertical earth wall